High speed aluminum foil beer label rotogravure printing machine

FOB Reference Price:Get Latest Price
  • 1 - 2
    US $250000.00
  • 3 - 4
    US $240000.00
  • >=5
    US $220000.00
Supply Ability:
4 Set/Sets per Month High speed aluminum foil beer label rotogravure printing machine
Port:
shanghai
Report Suspicious Activity
Overview
Quick Details
Type:
Rotogravure Printing Machine
Condition:
New
Place of Origin:
Jiangsu, China (Mainland)
Brand Name:
CHENGBAO MACHINE
Model Number:
CBYA-P1
Usage:
Label Printer, aluminum foil printing
Automatic Grade:
Automatic
Color & Page:
Multicolor
Voltage:
380V
Gross Power:
360KW
Dimensions(L*W*H):
25000(L) x 3550(W) x 3000 (H)mm
Weight:
45000KG
Certification:
CE/ISO9001
Warranty:
1 Year
After-sales Service Provided:
Engineers available to service machinery overseas
Printing speed:
220m/mm
Print Material:
aluminum foil,paper
Printing width:
650mm,850mm
Printing colors:
1-12 colors
Print cylinder diameter:
120-280mm
Oven length:
1800mm
Un&rewind max. diameter:
600-800mm
Drying method:
Electric Heating
Color register:
automatic
Un&rewind material roll change:
auto splicing
Packaging & Delivery
Packaging Details
High speed aluminum foil beer label rotogravure printing machine
Machine spearated into parts and packaged in plastic film which need about four 40HC container
Delivery Time
about 120 working days after down payment
Product show

Suitable material

This serie of printing machine is suitable for aluminum foil of 8.5-40um(thinckness), and paper of 30-80g/㎡

Technical parameters
Printing direction
from left to right
Print colors
1- 12 colors
Material width
650MM
Max. Printing speed
220/min.( cylinder diameter φ170mm)
Print cylinder diameter
φ120mm~φ280 mm
Cylinder install
 shaft-less and pneumatic
Printing registration accuracy
±0.1mm (automatic registration system).
Max. unwind & rewind diameter
φ600 mm
Automatic tension range
3~30kg
Ppaer core inner diameter
76mm(inner) ×Ф94mm(outer)
Air source
0.8Mpa
Force of impression
350kg
Scraper string move
±5 mm
Drying way
electric heating (standard)
Total power
360kw
Total weight
about 45000kgs.
Ink supply way
Pneumatic diaphragm pump cycle for ink
Product flow diagram

How to do regarding quality control?
We always attach great importance to quanlity controlling from the beginning of design according to different customer requirement to the end of delivery. Imported CNC machining tools control the accuracy of pivotal machine parts, strict inspection, maturity processes for both mechanical and electrical insatllation, adopt international electricity brand and so on, test run serval times and inspected by customer themselves, professional package and delivery.

Service and customer

Pre-Sales Service

* Inquiry and consulting support. 

* Sample material testing support. 

* View our factory and products

After-Sales Service

* Training how to instal the machine, training how to use the machine. 

* Engineers available to service machinery overseas.

Company show
Packing & Delivery
Packaging
Size
25000(L) x 3550(W) x 3000 (H)mm
Weight
about 45000 kgs



Packaging Details
The machine will be separated into serval parts and packaged in plastic film professionaly by our technicians in the factory

Delivery 

1. The machine will be ready in about 120 working days after received down payment.


2. It needs about fOUR 40HC container to ship it.


3. All the parts will be fixed in the container

FAQ

1, Q: Are you a factory or trading company?
A: We are a factory

2, Q: Where is your factory located, how can I visit there?
A: Our factory is located in Jiangyin city, Jiangsu province, China. You can fly to Shanghai airport, and take a freeway train to wuxi dong station, we will arrange for picking up. All our clients are warmly wlcome to visit us.

3, Q: How does you factory do regarding quality control?
A:We always attach great importance to quality controlling from the beginning to the end. Imported CNC machining tools control the accuracy of pivotal machine parts, strict inspection, maturity processes for assembly, international electricity brand and so on.

4. Q:Payment terms?
A: 30% by T/T before production, 70% by T/T or Irrevocable L/C at sight before shipment

5. Q: Deiivery time?
A: About 120 working days after received down payment

Contact us
Related Products